On Monday, July 11, 2022 between 9 and 10 a.m., the water is being cut off to our entire complex. There is a leaking main water line that will be repaired on Monday. The repair and water cut-off are estimated to take between 6 and 8 hours.
Be sure to shower before 9 a.m. and you should fill your tub with water so you can flush your toilet if needed.
Buildings "C", "D", "E", and "J" will be sprayed quarterly on the third Friday of these months:
A representative from Lewis Critter Gitters will be onsite to inspect / spray for pests in these buildings during this time frame.